Our work

Proven infrastructure solutions.

Seven projects across firefighting, district cooling and oil & gas. Select any project to read how it was analysed.

Selected work

Crude Oil Tank Farm Firefighting and Cooling Ring System

Crude Oil Tank Farm Firefighting and Cooling Ring System

Firefighting · 2025

  • ASME B31.3
  • ASME B31.4
  • CAESAR II

Stress and flexibility analysis of a firefighting and shell-cooling ring system serving six crude oil tanks in Suez, with buried headers and shell-mounted rings analysed in one dual-code model.

View project
District Cooling Plant — Cooling Tower Piping

District Cooling Plant — Cooling Tower Piping

District Cooling · 2026

  • ASME B31.1
  • ASME B16.5
  • Bentley HAMMER
  • CAESAR II
  • Revit
  • Surge Analysis

Stress and flexibility analysis of a DN 600 to DN 200 condenser water riser and cooling tower distribution system in Greater Cairo, with seismic, settlement and hydraulic transient analysis.

View project
Buried HDPE Firewater Network — Multi-Discipline Pipeline Design

Buried HDPE Firewater Network — Multi-Discipline Pipeline Design

Firefighting · 2026

  • HDPE
  • ASME B31.3
  • AWWA M55
  • ISO 4427-1
  • API 15LE
  • CAESAR II
  • Crane Crossing
  • Surge Analysis

Plant-wide buried HDPE firewater network design and stress analysis from DN 630 to DN 63 at Ras Laffan Industrial City, covering soil-pipe interaction, crane crossings, upheaval buckling, seismic, surge and thrust-block loads.

View project

Buried Chilled Water Distribution Network — Stress Analysis

District Cooling · 2026

  • ASME B31.1
  • ASME B16.5
  • CAESAR II
  • AASHTO
  • Buried Piping
  • Seismic Analysis

Stress and flexibility analysis of an approximately 1,050 m buried chilled water supply and return network at the Mental Health Hospital, Riyadh Campus, from DN 250 to DN 50.

View project

Crude Oil Export Pipeline — FEED, Gulf of Suez, Egypt

Oil & Gas · 2025

  • ASME B31.4
  • ASME B31.3
  • API RP 1102
  • API 5L
  • CAESAR II
  • Pipeline FEED
  • HDD Crossing
  • Sour Service

Front-end engineering design of an 18-inch buried sour crude export pipeline linking a new marine terminal to the national 30-inch crude grid, with route selection, wall thickness, material grade, crossings and pig-trap stations.

View project

Chilled Water Distribution Network — Stress Analysis & Support Design, Kuwait

District Cooling · 2025

  • ASME B31.1
  • AISC 360-16
  • ACI 318-14
  • CAESAR II
  • SAP2000
  • IDEA StatiCa
  • Support Design
  • Closed Loop

Final design of a DN 900 closed-loop chilled water network at a health sciences campus in Kuwait, with CAESAR II stress analysis, support and base connection design, marked-up layouts and construction drafting.

View project

Buried GRE Firewater Network — Gas Treatment Plant, Egypt

Firefighting · 2025

  • ISO 14692
  • ASME B31.3
  • GRE
  • CAESAR II
  • Buried Piping
  • Seismic Analysis
  • Thrust Blocks
  • Laminate Reinforcement

ISO 14692 stress analysis of a plant-wide buried glass-reinforced epoxy firewater network with 174 lines from 2 to 18 inches in one CAESAR II model, with local laminate reinforcement issued for construction.

View project

Need a similar analysis?

Get a quote