Selected work

Crude Oil Tank Farm Firefighting and Cooling Ring System
- ASME B31.3
- ASME B31.4
- CAESAR II
Stress and flexibility analysis of a firefighting and shell-cooling ring system serving six crude oil tanks in Suez, with buried headers and shell-mounted rings analysed in one dual-code model.
View project
District Cooling Plant — Cooling Tower Piping
- ASME B31.1
- ASME B16.5
- Bentley HAMMER
- CAESAR II
- Revit
- Surge Analysis
Stress and flexibility analysis of a DN 600 to DN 200 condenser water riser and cooling tower distribution system in Greater Cairo, with seismic, settlement and hydraulic transient analysis.
View project
Buried HDPE Firewater Network — Multi-Discipline Pipeline Design
- HDPE
- ASME B31.3
- AWWA M55
- ISO 4427-1
- API 15LE
- CAESAR II
- Crane Crossing
- Surge Analysis
Plant-wide buried HDPE firewater network design and stress analysis from DN 630 to DN 63 at Ras Laffan Industrial City, covering soil-pipe interaction, crane crossings, upheaval buckling, seismic, surge and thrust-block loads.
View projectBuried Chilled Water Distribution Network — Stress Analysis
- ASME B31.1
- ASME B16.5
- CAESAR II
- AASHTO
- Buried Piping
- Seismic Analysis
Stress and flexibility analysis of an approximately 1,050 m buried chilled water supply and return network at the Mental Health Hospital, Riyadh Campus, from DN 250 to DN 50.
View projectCrude Oil Export Pipeline — FEED, Gulf of Suez, Egypt
- ASME B31.4
- ASME B31.3
- API RP 1102
- API 5L
- CAESAR II
- Pipeline FEED
- HDD Crossing
- Sour Service
Front-end engineering design of an 18-inch buried sour crude export pipeline linking a new marine terminal to the national 30-inch crude grid, with route selection, wall thickness, material grade, crossings and pig-trap stations.
View projectChilled Water Distribution Network — Stress Analysis & Support Design, Kuwait
- ASME B31.1
- AISC 360-16
- ACI 318-14
- CAESAR II
- SAP2000
- IDEA StatiCa
- Support Design
- Closed Loop
Final design of a DN 900 closed-loop chilled water network at a health sciences campus in Kuwait, with CAESAR II stress analysis, support and base connection design, marked-up layouts and construction drafting.
View projectBuried GRE Firewater Network — Gas Treatment Plant, Egypt
- ISO 14692
- ASME B31.3
- GRE
- CAESAR II
- Buried Piping
- Seismic Analysis
- Thrust Blocks
- Laminate Reinforcement
ISO 14692 stress analysis of a plant-wide buried glass-reinforced epoxy firewater network with 174 lines from 2 to 18 inches in one CAESAR II model, with local laminate reinforcement issued for construction.
View project