Project overview
Project details
- Client
- Healthcare campus developer (via mechanical contractor)
- Year
- 2026
- Category
- District Cooling
- Location
- Riyadh, Saudi Arabia
- ASME B31.1
- ASME B16.5
- CAESAR II
- AASHTO
- Buried Piping
- Seismic Analysis
Stress and flexibility analysis of an approximately 1,050 m buried chilled water supply and return network at the Mental Health Hospital, Riyadh Campus. The scope covers DN 250 to DN 50 piping, soil interaction, seismic loads and civil restraint loads.
Delivered under NDA. Model geometry, node numbering and identifying project data are generalised.
- ~1,050 mburied network
- 22load cases
- 67.8%peak expansion, against a 90% limit
The challenge
- A network of about 1,050 m with a 9 °C operating differential across five pipe diameters.
- The pipe is fully engaged against dense granular fill at 1.93 m cover.
- Restrained thermal growth in a line this long would normally call for thrust blocks or expansion joints. Both add civil cost, buried maintenance liability and a long-term leakage risk beneath a live hospital campus.
Our approach
- One continuous model of 2,056 elements covering both supply and return, so soil friction, branch interaction and chamber restraint were captured across the whole network.
- Soil stiffness modelled as bi-linear restraints, with yield forces varying by diameter and burial condition.
- Sustained cases run with and without friction to isolate its effect.
- A 22-case load matrix: hydrotest, sustained (with and without friction), two operating conditions, thermal expansion and four-directional seismic.
- Seismic qualification at 0.2 g horizontal and 0.1 g vertical, assessed as occasional loads alone and combined with sustained loads.
- Restraint loads extracted for valve chamber and civil anchor design.
- Deliverables: stress isometrics and a full CAESAR II input and output record for approval.
The outcome
- All 22 load cases passed to ASME B31.1.
- Peak sustained stress was 3.9% of allowable. Peak expansion stress was 67.8% against a 90% acceptance limit.
- Maximum operating displacement was about 4 mm.
- No thrust blocks and no expansion joints were needed anywhere in the network, removing those buried components and their civil works from scope.
Codes, standards and tools
- ASME B31.1 (2018)
- ASME B16.5
- AASHTO soil classification
- CAESAR II 2019 v11.00